The Old Gotthard Tunnel Route - Driver's Eye View

The Old Gotthard Tunnel Route - Driver's Eye View (2018)

TMDb

0.0

01/10/2018 • 1h 52m
original-title

The Old Gotthard Tunnel Route - Driver's Eye View

status

Released

production-companies

Video 125

original-language

English

budget

-

revenue

-

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

production-countries

United Kingdom

spoken-languages

English

Part of the London Underground Driver's Eye View

View The Collection
London Underground Driver's Eye View

Reviews

loading-reviews